| Sign In | Join Free | My qualitytoyschina.com |
|
Brand Name : Shunyao Supply Chain
Place of Origin : Chengdu , China
MOQ : 100 PCS
Price : $800-1200
Payment Terms : T/T
Supply Ability : Excellent
Delivery Time : 5-15 days
Packaging Details : Bundles
Application : Industrial/Commercial
Loadcapacity : Up to 1000 kg/m²
Frametype : Welded/ Bolted
Package : Steel pallet
Shipment By : Container
Customization : Available
Design Style : Traditional
Usage : Warehouse/ Industrial/ Commercial
Spanrange : 6m to 40m
Design Parameter : Wind Load,Snow Load And Earthquake
Windloadresistance : Designed for local wind load standards
Load Bearing Capacity : High
Product : Steel Structure
Insulation : EPS, Glasswool, Rockwool, PU On Option
Size : Customized
Load Capacity : Up to 1000 kg/m²
Frame Type : Welded/Bolted
Span Range : 6m to 40m
Material Thickness : 1.5mm
Material Type : Q700 High-strength Steel
Weight : 24.7kg/m²
Reusable Times : 300 times
Demolding Time : 24h for columns, 36h for floors
Formwork Width : 65mm
Insulation Options : EPS, Glasswool, Rockwool, PU
| Item | Plywood Formwork | Aluminum Formwork | High-strength Alloy Formwork |
|---|---|---|---|
| Size | Single size, requires on-site cutting | Modular, Serialized, Standardized | Modular, Serialized, Standardized |
| Environmental Benefits | High wood usage, Not environmentally friendly | Low wood usage, Environmentally friendly | Low wood usage, Environmentally friendly |
| Film Material | 15mm Plywood | 4.0mm Aluminum Board | 1.5mm High-strength Alloy Board |
| Weight (kg/m²) | 13.5kg/m² | 23.5kg/m² | 24.7kg/m² |
| Construction Efficiency | More than 5 days/Floor | 4 to 5 days/Floor | 4 to 5 days/Floor |
| Time of Demolding | At least 168h needed to demold floors | 24h for column/shear wall, 36h for floors | 24h for column/shear wall, 36h for floors |
| Concrete Quality | Rough surface, prone to defects, requires plastering | Smooth surface, bare concrete finishes, easy demolding | Smooth surface, bare concrete finishes, easy demolding |
| Reusable Times | Less than 10 times, prone to warping and damage | More than 200 times, easy disassembly | More than 300 times, easy disassembly |
| Material Loss | Large loss with significant construction waste | Low loss, easy to clean | Low loss, easy to clean |
| Technical Requirements | High technical requirements, professional technicians | Low technical requirements, ordinary workers | Low technical requirements, ordinary workers |
|
|
Reuse 300 Times High-strength Alloy Steel Formwork System for Concrete Construction to Replace Aluminum Formwork Images |